- Home >
- About Trine >
- Campus Transformation >
- Completed Projects
Completed Projects
Ryan Skywalk

Ryan Skywalk, an open–air pedestrian that spans across Park Avenue from the University Center to the Fred Zollner Athletic Stadium, provides ease of access to stadium suites and means of egress. Gifts from trustee Cliff Ryan and his wife, Sig, of Naples, Fla., and alumnus and trustee Jack Shaw and his wife, Sue, of Coldwater, Mich., made the skywalk a reality. Design Collaborative in Fort Wayne designed the skywalk, with Ron Dick serving as the lead architect.
Open date: August 2011.
Hershey Hall Boiler Retrofit
This project replaced two (2) American Standard Kewanee 200 horsepower steam boilers that inefficiently served the heating needs of Hershey Hall athletic facility with four (4) Lochinvar Copper Fin II hot water boilers, pumps, pipes and fittings sized to provide the building heat more efficiently.
This project was funded, in part, by the Indiana office of energy development and the U.S. Department of Energy.
Completion Date: Winter 2010
Click logos for additional information
Fred Zollner Athletic Stadium


Fred Zollner Athletic Stadium, completed in 2010, is a state of the art micro–stadium for football, lacrosse and field hockey. With a capacity of more than 5,000 fans, the stadium is complete with four suites, press box, control room, a spacious hospitality box for supporters, and its open–air Thunder Club Thunder deck. The stadium provides a tremendous facility for both day and night games and practice for Thunder teams. The stadium also houses football offices, a weight room, sports medicine area, and a large scoreboard.
Open date: Fall, 2010.
Jannen Field

Jannen Field is home of the Thunder baseball team. With recent updates including a grandstand with chairs for 100 fans, men and women′s restrooms, a full–service concession stand and a brand–new sound system. The grandstand also includes an internet accessible, 12–sea,t air–conditioned press box.
Open date: Spring 2010.
Keith E. Busse/Steel Dynamics Inc.
Athletic and Recreation Center


The Keith E. Busse/Steel Dynamics Inc. Athletic and Recreation Center is a multi-purpose, sports complex with an indoor 200-meter track, tennis courts, volleyball, baseball/softball cages, basketball, indoor soccer, lacrosse and more.
Open date: Spring 2009.
University Center and Center for Technology and Online Resources

The 73,000-square-foot facility houses the University Center and Center for Technology and Online Resources, 320-seat Fabiani Theatre, Whitney Commons dining area, Sponsel Library, Bookstore, Hornbacher Fitness Center, rock climbing wall, WEAX student radio station and more.
Open date: August, 2007.
C.W. Sponsel Administration Center

Originally built in 1887, the C.W. Sponsel Administration Center in Sniff Hall was completely restored in 2007.
Open date: October 2007.
Golf Course Apartments

Students in our new Golf Course Village apartments enjoy breathtaking views of our own Zollner Golf Course! The common area includes vaulted ceilings with the second-floor overlooking, big-screen TV, and cozy fireplace complete with leather furnishings. Fully furnished apartments have central living areas, double room occupancy, 10-foot ceilings, private balconies, climate contolled bedrooms, and cable and Internet access. Located on the lower level is the game room; laundry areas are available on each floor.
Open date: August 2008 and January 2009.
Shive Field

Shive Field , with new artificial turf, includes a student section where the Blue Crew, cheerleaders, and a student band create a frenzy of excitement among students, visiting alumni, and parents. This is the practice and game field for a number of Thunder athletic teams, including the nationally ranked Thunder football team, as well as the lacrosse and field hockey teams.
Open date: August, 2008.
University Center Apartments

University Center Apartments are double-room occupancy, two- or three-bedroom, fully-furnished apartments that offer a common living area and semi-private baths. Bedrooms have cable and Internet access, and each suite is climate-controlled. On the main level in each building, students have access to a vending area and a common lounge area with wireless Internet access, a large screen TV, and fireplace. Located on the lower level is the game room; laundry areas are located on each floor.
Open date: August 2007.
Campus Village

The Campus Village includes the Ingledue and Trine Villas, which are located at the corner of Park Avenue and Oakwood Street. These fully furnished, townhouse-style villas feature private bedrooms with cable TV and Internet access in each room, semi-private baths, living rooms with a color TV and DVD player, and full kitchen areas. Each apartment is climate-controlled and has a washer and dryer. The Campus Village houses 112 upper-class students who are eligible to live in a three-, four-, or five- bedroom villa based on combined GPA and good social standing with the University.
Open date: August 2006.
Moss Street Apartments

Moss Street Apartments resemble Kinney Street Apartments and University Center Apartments, but offer three-bedroom suites. Students have access to a vending area and a common lounge area with wireless Internet access, a large-screen TV and fireplace.
Open date: August, 2007.
Widmann Hall

Widmann Hall offer double-room occupancy, two- or three-bedroom, fully-furnished apartments that offer a common living area and semi-private baths. Bedrooms have cable and internet access, and each suite is climate-controlled. On the main level in each building, students have access to a vending area and a common lounge area with wireless Internet access, a large screen TV, and fireplace. Located on the lower level is the game room; laundry areas are located on each floor.
Open date: August 2007.






